Realized Works


GABRIEL RIDE CONTROL

· Installation of security interlock as well as programming of the same, installation and programming of safety curtains of the mill line.

COOLING TOWER:

  • Distribution of water monitoring, clear understanding of water flow, pressure and temperature.
  • Automatic start of pumps with specific pressure ranges.
  • Monitoring of system failures.
  • PLC MicroLogix with Panel View Plus and installation and programming of Pressure, Flow and Temperature sensors.

MANUAL DRILLS:

  • Installation of double start cycle buttons.

CUTTER AND ASSEMBLY OF SHOCK ABSORBERS:

  • Technical support in cutting machine starter.
  • Programming of servo drives PLC programming.
  • Screen programming Cutler Hammer.
  • Training for maintenance personnel.

INTEGRATION OF 4 CELLS OF ABB ROBOTS:

  • 4 ABB robot cells with DeviceNet communication were integrated.
  • Installation of welding machine SKS MIC.
  • Panel View Plus 600.
  • Curtains and Security methods.
  • OptoTouch for cycle start.

SILVER CELL:

  • Installation and start-up of a fully automatic rod and piston assembly cell.
  • Programming of Ultra Master 100 servo drives for motor positioning.
  • Programming of vision camera IFM Efector as pokayoke.
  • Balluff vision camera programming as pokayoke.
  • Programming for new models for shock absorbers from different suppliers.

DESIGN OF POKAYOKE FOR BUSH MONITORING IN SHOCK ABSORBERS:

  • PLC programming.
  • Installation of laser and fiber optic sensors.
  • Key lock system and fault indicator light.

DUAL PAINT LINE:

  • Station 1 and 2 PRE-UNGENERATION
  • Re-engineering and Installation of Carbon Steel Manifold.
  • Implementation of New Sprinkler System.
  • Change of Gusher Pumps in both stations.
  • Station 5 PHOSPHATE
  • Reengineering and Installation of Stainless Steel Manifold.
  • Change of Gusher Pumps.
  • Station 4 and 7
  • Installation of Electrical Boards for the control of the PH and Temperature sensors in both stations.
  • Installation and Calibration of PH and Temperature Sensors in both Stations 4 and 7.
  • Station 3 and 6
  • Valve Installation to provide a Constant Flow.

ACC PAINT LINE:

  • Installation of Sensors for Flow, PH and Temperature monitoring.
  • Design and Installation of Electric Board.
  • PLC programming Micrologix 1500 and Panel View Plus 700.
  • Design of View Plus 700 Panel Control Screens.
  • Carcass Tank Coating in Stainless Steel.


MARTINREA

INTEGRATION OF 2 CELLS:

  • Robot programming.
  • PLC programming.
  • Supply of Services (Air, Water, Gas, Electricity).
  • Installation of Welding Guns in Arm Robots.
  • Installation of Fixtures.


KSR INTERNACIONAL

ABB ROBOT INTEGRATION:

  • An ABB robot was integrated, the PLC of the rotary table was programmed and the fixture of the table was adapted.


ONTARIO DIE INTERNACIONAL

MACHINED AREA:

    Project Integration:
  • Calculation of Electricity.
  • Manufacturing and Installation of Power Supply. (Pipe, Circuit Power Tray).
  • Lay Out of the Project.
  • Engineering and Project Startup Support.

INSTALLATION OF LINE THREADED:

    Project Integration:
  • Calculation Engineering.
  • Electrical installation.
  • Lay Out design.
  • Support in Project Start-up.

MAINTAINING A MAIN TRANSFORMER:

  • Preventive Maintenance.
  • Cleaning Main Board.
  • Oil tests.
  • Protection Review.


SAINT GOBAIN

  • Supply and installation of interlock in conventional lathes, CNC lathes.
  • Pokayoke installation on MARCONI machine.
  • Machine PLC update EXTRUDER # 15.
  • Personnel by Administration.


VRK AUTOMOTIVE SYSTEMS

MOVEMENT OF MACHINERY:

  • Installation of Hydraulic and Pneumatic Supplies.
  • Lay out trace for the final position of Maquinária.
  • Disconnection and Electrical, Pneumatic and Hydraulic Connection.

MODIFICATION OF ONLINE E-COAT PAINT TRANSPORTER:

  • Disconnection, Modification and Connection of Hydraulic and Pneumatic Supplies.
  • Conveyor Modification: Reduction of 500m to 40m of Chain Length.
  • Disconnection, Modification and Electrical Connection.
  • Total reduction of E-Coat Paint Line area.