· Installation of security interlock as well as programming of the same, installation and programming of safety curtains of the mill line.
- Distribution of water monitoring, clear understanding of water flow, pressure and temperature.
- Automatic start of pumps with specific pressure ranges.
- Monitoring of system failures.
- PLC MicroLogix with Panel View Plus and installation and programming of Pressure, Flow and Temperature sensors.
- Installation of double start cycle buttons.
- Technical support in cutting machine starter.
- Programming of servo drives PLC programming.
- Screen programming Cutler Hammer.
- Training for maintenance personnel.
- 4 ABB robot cells with DeviceNet communication were integrated.
- Installation of welding machine SKS MIC.
- Panel View Plus 600.
- Curtains and Security methods.
- OptoTouch for cycle start.
- Installation and start-up of a fully automatic rod and piston assembly cell.
- Programming of Ultra Master 100 servo drives for motor positioning.
- Programming of vision camera IFM Efector as pokayoke.
- Balluff vision camera programming as pokayoke.
- Programming for new models for shock absorbers from different suppliers.
- PLC programming.
- Installation of laser and fiber optic sensors.
- Key lock system and fault indicator light.
- Station 1 and 2 PRE-UNGENERATION
- Re-engineering and Installation of Carbon Steel Manifold.
- Implementation of New Sprinkler System.
- Change of Gusher Pumps in both stations.
- Station 5 PHOSPHATE
- Reengineering and Installation of Stainless Steel Manifold.
- Change of Gusher Pumps.
- Station 4 and 7
- Installation of Electrical Boards for the control of the PH and Temperature sensors in both stations.
- Installation and Calibration of PH and Temperature Sensors in both Stations 4 and 7.
- Station 3 and 6
- Valve Installation to provide a Constant Flow.
- Installation of Sensors for Flow, PH and Temperature monitoring.
- Design and Installation of Electric Board.
- PLC programming Micrologix 1500 and Panel View Plus 700.
- Design of View Plus 700 Panel Control Screens.
- Carcass Tank Coating in Stainless Steel.
- Robot programming.
- PLC programming.
- Supply of Services (Air, Water, Gas, Electricity).
- Installation of Welding Guns in Arm Robots.
- Installation of Fixtures.
- An ABB robot was integrated, the PLC of the rotary table was programmed and the fixture of the table was adapted.
-
Project Integration:
- Calculation of Electricity.
- Manufacturing and Installation of Power Supply. (Pipe, Circuit Power Tray).
- Lay Out of the Project.
- Engineering and Project Startup Support.
-
Project Integration:
- Calculation Engineering.
- Electrical installation.
- Lay Out design.
- Support in Project Start-up.
- Preventive Maintenance.
- Cleaning Main Board.
- Oil tests.
- Protection Review.
- Supply and installation of interlock in conventional lathes, CNC lathes.
- Pokayoke installation on MARCONI machine.
- Machine PLC update EXTRUDER # 15.
- Personnel by Administration.
- Installation of Hydraulic and Pneumatic Supplies.
- Lay out trace for the final position of Maquinária.
- Disconnection and Electrical, Pneumatic and Hydraulic Connection.
- Disconnection, Modification and Connection of Hydraulic and Pneumatic Supplies.
- Conveyor Modification: Reduction of 500m to 40m of Chain Length.
- Disconnection, Modification and Electrical Connection.
- Total reduction of E-Coat Paint Line area.